Soils

Soils

Home Topics Soils Reports & Publications

LOADING...

loading stats

Please be patient.

Search


Searched for: Soils
 
  1. CLEAR LAKE - Ground Fracture - Southwest Shore, Section 16, T. 46 N., R. 7 E., M.D.M.

    thumbnail

    KP-2509-R2- Klamath Project - CLEAR LAKE - Ground Fracture - Southwest Shore, Section 16, T. 46 N., R. 7 E., M.D.M. Close-up view of one of the fracture channel enlargements showing the soil and the fracture...

  2. Low Cost Canal Lining - J-3 Lateral

    thumbnail

    KP-1689 - Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Dragline placing earthcover over bentonite layer in ditch. Soil cover is to prevent mechanical...

  3. Low Cost Canal Lining - J-3 Lateral.

    thumbnail

    KP-1690- Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Bentonite is spread along upper edge of bank and raked down the slope and into the top layer of...

  4. Low Cost Canal Lining - J-3 Lateral

    thumbnail

    KP-1691 - Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Dragline placing earthcover over bentonite layer in ditch. Soil cover is to prevent mechanical...

  5. General view of the Pumping Plant E, looking south

    thumbnail

    KP-1172-R2 Klamath Project; General view looking south from plant "E" showing power line installations after the flooding operations are over, fields now in grain and the power line straightened up. Refer to...

  6. Sherman Waldrip operates a six row beet cultivator on his small farm

    thumbnail

    KP-1188-R2 - Klamath Project. Region II. He and his brothers have leased this farm while awaiting the outcome of their applications to homestead some of the land that will be opened to settlement this fall in...

  7. CLEAR LAKE GROUND FRACTURE, Southwest shore, Section 16, T.46 N., R 7 E.

    thumbnail

    KP-2559-R2-Klamath Project - CLEAR LAKE GROUND FRACTURE, Southwest shore, Section 16, T.46 N., R 7 E. View showing washout place in fracture approximately 15 feet below surface. Fracture narrows down in places,...

  8. CLEAR LAKE GROUND FRACTURE, Section 16, T.46 N., R.7 E.

    thumbnail

    KP-2562-R2-Klamath Project - CLEAR LAKE GROUND FRACTURE, Section 16, T.46 N., R.7 E. General view of fracture looking south from water's edge, showing depression extending out into water from open end of...

  9. TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y"

    thumbnail

    KP-2586-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y". Completed Pumping Plant "Y" showing gravel surfacing and soil sterilant at toe of embankment in background;...

  10. Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor

    thumbnail

    P12-201-4610NA Klamath Project, OR-CA. 'A' Dike #16, Klamath Straits Unit West -- Test excavation of 'A' Dike #10 with 627 B scrapers. With the sandy soil found here, the scrapers were able to excavate ±2',...

Pages