Soils

Soils

Home Topics Soils Reports & Publications

LOADING...

loading stats

Please be patient.

Search


Searched for: Soils
 
  1. Low Cost Canal Lining - J-3 Lateral

    thumbnail

    KP-1691 - Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Dragline placing earthcover over bentonite layer in ditch. Soil cover is to prevent mechanical...

  2. General view of the Pumping Plant E, looking south

    thumbnail

    KP-1172-R2 Klamath Project; General view looking south from plant "E" showing power line installations after the flooding operations are over, fields now in grain and the power line straightened up. Refer to...

  3. Sherman Waldrip operates a six row beet cultivator on his small farm

    thumbnail

    KP-1188-R2 - Klamath Project. Region II. He and his brothers have leased this farm while awaiting the outcome of their applications to homestead some of the land that will be opened to settlement this fall in...

  4. CLEAR LAKE GROUND FRACTURE, Southwest shore, Section 16, T.46 N., R 7 E.

    thumbnail

    KP-2559-R2-Klamath Project - CLEAR LAKE GROUND FRACTURE, Southwest shore, Section 16, T.46 N., R 7 E. View showing washout place in fracture approximately 15 feet below surface. Fracture narrows down in places,...

  5. CLEAR LAKE GROUND FRACTURE, Section 16, T.46 N., R.7 E.

    thumbnail

    KP-2562-R2-Klamath Project - CLEAR LAKE GROUND FRACTURE, Section 16, T.46 N., R.7 E. General view of fracture looking south from water's edge, showing depression extending out into water from open end of...

  6. TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y"

    thumbnail

    KP-2586-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y". Completed Pumping Plant "Y" showing gravel surfacing and soil sterilant at toe of embankment in background;...

  7. Kl. Str. Distribution and Drainage System, East and West, Specs. 20-C0034, Elting Construction, Inc., Contractor

    thumbnail

    P12-201-4610NA Klamath Project, OR-CA. 'A' Dike #16, Klamath Straits Unit West -- Test excavation of 'A' Dike #10 with 627 B scrapers. With the sandy soil found here, the scrapers were able to excavate ±2',...

  8. Weed sprayer purchased for soil & moisture work on Federal withdrawn lands, March 25, 1974

    thumbnail

    CN-12-201-484-NA Klamath Project - Oregon-California. 200 gallon tank, #1200 diaphragm pump with 7 H.P. motor. 25 foot 3-piece boom, with 6508 Tee Jets, required valves and 200'3/8" spray hose and needed...

  9. Gerber Watershed - Klamath Project, Oregon-California

    thumbnail

    CN-12-200-32A Gerber Watershed - Klamath Project, Oregon-California. View of one of many check dams in spreader area. This particular check dam is located on the upper ditch that follows the ridge top running...

  10. Snow survey and water supply forecast assessment : Klamath Intergovernmental Workgroup, November 3, 2004, Portland, Oregon

    thumbnail

    This document is a Microsoft PowerPoint presentation transferred into a .pdf file format and placed onto the Natural Resources

Pages

randomness