LOADING...
Please be patient.
KP-2415-R2 - ENTERPRISE POWER PLANT - Klamath Project. View of plant from downstream and showing concrete floor rubble and rock washed down to transition; November 1, 1957; Photo by K. J. Greene
KP-2390-R2 - Klamath Project--ENTERPRISE POWER PLANT. Outlet showing flow through 4ft. x 6ft. hole in power plant structure and through bypass. Flow is about 600 cfs and is smooth downstream; June 13, 1957;...
KP-2543-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to pumping plant intake showing removable motor deck sections and float switch well; December 9, 1959; Photo by K.J. Greene
KP-2617-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking northwest to pumping plant. 102-A-1 Drain on left and 102 Drain on right; July 7, 1961; Photo by K.J. Greene
KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary...
KP-2470-R2 - Klamath Project--ENTERPRISE POWER PLANT CONVERSION TO CANAL DROP. View of forebay looking northeast towards gates from "A" Canal. Flow of about 670 cfs; July 11, 1958; Photo by K. J. Greene
KP-2472-R2 - Klamath Project--ENTERPRISE POWER PLANT CONVERSION TO DROP. View of outlet and downstream end. Water is very turbulent at outlet but smooths out in about 50 ft.; July 11, 1958; Photo by K. J....
KP-2480-R2 - Klamath Project - TULELAKE IRRIGATION DISTRICT PUMPING PLANT "V". View looking north showing excavation for pumping plant. Rock in drain has not been removed to grade; October 21, 1958; Photo by ...
KP-2391-R2 - Klamath Project--ENTERPRISE POWER PLANT. Concrete lining is about 3" thick. Reinforcement shows considerable corrosion; June 13, 1957; Photo by K. J. Greene
KP-2393-R2 - Klamath Project--ENTERPRISE POWER PLANT. Turbine not operating; June 13, 1957; Photo by K. J. Greene