P12-201-4527 NA Klamath Project, OR-CA. Photo shows Manitowoc dragline with 80 ft. boom and 2 1/4 cu.yd. bucket excavating drain upstream of plant FF inlet. Inlet transition can be seen, looking east. ...
P12-201-4528 NA Klamath Project, OR-CA. Cold weather protection that was installed for painting Plant FF pump units and also utilized for dressing up face of wall where spillage occurred when placing deck to...
P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high water...
P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by D.J....
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the drain...
P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
P12-201-4552NA Klamath Project, OR-CA. Pumping Plant E. Photo shows Bucyrus Erie 22B and TD-20 cat, both of which have been crossing repeatedly on flume bridge east side; April 7, 1978; USBR photo by D.J....
P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR photo...