P12-201-4328 NA Klamath Project, OR-CA. View of pumping plant EE looking n. e. at piling with rows 6 thru 12 completed. Not shown are the 3 extra piling requred by the Regional office; February 17, 1977;...
P12-201-4329 NA Klamath Project, OR-CA. Entrance side to Plant FF. Flume bridge resteel with some outer forming in place. Note: In background some cutoff poling from construction bridge; February 21, 1977;...
P12-201-4331 NA Klamath Project, OR-CA. View of construction bridge, Pumping Plant FF. Here you can see both bents, #3 and #4; February 21, 1977; USBR photo by D. J. Kline
P12-201-4332 NA Klamath Project, OR-CA. Pumping Plant FF-Nearly completed foundation of construction bridge with sway and cross bacing (sic) all 4"x14"; February 23, 1977; USBR photo by D. J. Kline
P12-201-4333 NA Klamath Project, OR-CA. Pumping Plant FF-View of bent 32 with tower braces to bent 2+3. Here one can see bent 3+4; February 24, 1977; USBR photo by D. J. Kline
P12-201-4335 NA Klamath Project, OR-CA. Pumping Plant FF-Laying decking 4"x12" on top of interconnecting 16"x16" stringers; February 24, 1977; USBR photo by D. J. Kline
P12-201-4336 NA Klamath Project, OR-CA. Pumping Plant FF-completed bridge with P&H670 crane on end of bridge. Note: Guard rail around outside perimeter of construction bridge with 14"x14" curving on bridge...
P12-201-4337 NA Klamath Project, OR-CA. Pump used for water jetting piling on Plant EE. Suction line steel and outlet 2½" canvas; February 23, 1977; USBR photo by D. J. Kline
P12-201-4343 NA Klamath Project, OR-CA. Removal of Bent #4 of pile driving trestle with associated braces. Piling was cut off approx. 5" above sub-grade. Remainder of bridge left in place for construction...
P12-201-4347 NA Klamath Project, OR-CA. Pumping Plant EE - E-Con concrete pump with 5" pump line sitting on pile driving trestle; March 21, 1977; USBR photo by D. J. Kline