  1. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline

  2. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4557NA Klamath Project, OR-CA. Pumping Plant E Bridge. Bridge section is in position over abutments and is jacked down onto bearing pads in stages; April 1978; USBR photo by D.J. Kline

  3. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4558NA Klamath Project, OR-CA. Pumping Plant E Bridge. Completed and ready for travel; May 1978; USBR photo by D.J. Kline

  4. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo by D.J....

  5. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4567NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon outlet transition wa also flooded prior to CMP test as shown; April 6, 1978; USBR photo by D.J. Kline

  6. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side of a...

  7. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. Marks...

  8. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was then...

  9. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at RHC's...

  10. Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor

    thumbnail

    P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April 18,...